Daily Gauge Report

Date- 20/07/2011

Sr. No.

Name of the Project

Projected Gross Storage

Today's Gross Storage

Percentage

Resevoir Level (m.)

Last Year Gross Storage

Discharge from Reservoir (Cusecs)

Discharge from Canals (Cusecs)

 

 

Mcum.

Mcft.

Mcum.

Mcft.

 

 

Mcum.

Mcft.

Pen stockò

Valve

Spill Way

Right Bank

Left Bank

Major Project

1

Bhandardara

312.60

11039

166.98

5897

39.71

735.01

102.36

3615

850

07

-

-

-

2

Nilwande-2

103.78

3665

44.34

1566

42.72

616.45

6.12

216

-

-

-

0

-

3

Mula

736.23

26000

292.40

10326

39.71

541.52

197.87

6988

-

-

-

0

-

Medium Project

1

Adhala

30.01

1060

5.55

196

18.49

662.20

4.25

150

-

-

-

-

-

2

Mandohol

11.30

399

6.94

BSL

-

-

3.85

136

-

-

-

-

3

Ghatshil Pargaon

12.46

440

12.46

BSL

-

-

6.09

215

-

-

-